A13-2078 Nonprecedential Affirmed Processed

Catlin Underwriting Agencies, Ltd. v. ALLETE, Inc., d/b/a Minnesota Power, Schneider Electric USA, Inc., f/k/a Square D Company, as successor in interest to Power Distribution Services, Inc.

Minnesota Court of Appeals · Filed August 4, 2014

Opinion text

This opinion will be unpublished and
may not be cited except as provided by
Minn. Stat. § 480A.08, subd. 3 (2012).

STATE OF MINNESOTA
IN COURT OF APPEALS
A13-2078

Catlin Underwriting Agencies, Ltd., et al.,
Appellants,

vs.

ALLETE, Inc.,
d/b/a Minnesota Power,
Respondent,

Schneider Electric USA, Inc., f/k/a Square D Company,
as successor in interest to Power Distribution Services, Inc.,
Defendant.

Filed August 4, 2014
Affirmed
Rodenberg, Judge

St. Louis County District Court
File No. 69HI-CV-11-122

David S. Evinger, Emily P. Hennen, Grotefeld Hoffmann Schleiter Gordon & Ochoa,
LLP, Minneapolis, Minnesota (for appellants)

Thomas J. Basting, Jr., Elizabeth M. Brama, Diane B. Bratvold, Maren F. Grier, Briggs &
Morgan, Minneapolis, Minnesota (for respondent)

Considered and decided by Rodenberg, Presiding Judge; Johnson, Judge; and

Reilly, Judge.
UNPUBLISHED OPINION

RODENBERG, Judge

In this subrogation action, appellants Catlin Underwriting Agencies, Ltd. and

other interested insurers (Insurers) challenge the district court’s grant of summary

judgment to respondent ALLETE, Inc., d/b/a Minnesota Power, arguing that Minnesota

Power owes tort duties to United Taconite, LLC and that genuine issues of material fact

exist as to whether Minnesota Power breached those duties. Because Minnesota Power

owes no tort duties to United Taconite, we affirm.

FACTS

The United Taconite Fairlane plant facility, located in Forbes, is a taconite mining

and processing plant previously owned by Eveleth Mines, LLC. A system of protective

relays and circuit breakers protect the plant’s electrical equipment and its personnel.

Minnesota Power is an electrical utility company that provides electrical power to the

United Taconite plant. In 1997, Eveleth Mines and Minnesota Power entered into an

agreement titled “Amended and Restated Electric Service Agreement” (ESA). When

United Taconite purchased the plant, it acquired the rights and obligations of the ESA.

Under the ESA, United Taconite is required to maintain adequate protective

equipment for the plant and is liable for the design of its equipment on its side of the

point of delivery. The point of delivery is the end of Minnesota Power’s service drop,

which is located at two switches on the transmission lines inside the plant’s substation

fence. United Taconite owns all of the equipment inside the substation plant. After

electricity is “delivered,” the current runs through two United Taconite-owned oil circuit

2
breakers and a 115-kilovolt busbar to five United Taconite-owned transformers. The

transformers reduce the voltage to 4160 volts and then distribute the electricity to the

plant.

In addition to providing electricity to the plant, Minnesota Power provided

protective-relay maintenance services in 1997, 2000, and 2004. The plant has a series of

protective relays that sense fluctuations in the electrical current and signal other devices,

including circuit breakers, to interrupt the current when necessary.

In May 1997, Minnesota Power sent a proposal to Eveleth Mines for “the

cleaning, testing, and calibrating of each [Eveleth Mines] specified relay as well as the

documenting of the ‘as found’ and ‘as left’ relay settings.” Minnesota Power offered to

provide one technician to perform the testing in the plant, with the technician relying on

Eveleth Mines electricians “to keep a supply of relays ready for test[ing].” The proposal

directed Eveleth Mines to issue a purchase order if it wanted Minnesota Power to perform

the services. In October 1997, Eveleth Mines issued a purchase order to Minnesota

Power that stated: “Minnesota Power to test and calibrate [Eveleth Mines’] protective

relays as described in 5-15-97 proposal.”

In December 1997, Minnesota Power sent a letter to Eveleth Mines describing the

work it had performed. “The work included compiling relay information, visually

checking the relays for loose parts or connections and indications of problems, cleaning

relay contacts and taconite dust from the relays, testing the relays, recording the test

results and correcting any problems that could be fixed at the time.” The letter stated that

“[a] significant number of relays were found to be providing little to no protection

3
because of bent, missing or extremely dirty contacts and other mechanical parts” and that

“[s]etting sheets were not available on many of the relays, so it could not be determined if

they were at a desirable setting.” Minnesota Power then provided a list of

recommendations to Eveleth Mines, including to “function test[] the control circuits and

associated breakers to verify that the trip circuits are functional and [to perform] load

checks, to make sure that the relays are in fact monitoring the actual load current.”

In December 2000, Minnesota Power again provided maintenance on Eveleth

Mines’ protective relays. Also in 2000, Eveleth Mines hired Minnesota Power to conduct

a “Power System Study” to analyze the plant’s “existing electrical power system

equipment and facilities for possible electrical problems.” One of the two main parts of

the study was “a relay coordination study for finding possible problems with protective

devices during fault conditions” that included “all equipment on the 4160 volt system

down through the main 480 volt static trip breakers.” Individual motor overload

protection was not addressed. The relay coordination study “indicated that all electrical

equipment (that could be verified) has some fault protection, although some fault clearing

times may be longer than desired.”

In April 2004, Minnesota Power sent another proposal to United Taconite to test

the protective relays. The “scope of services would include the cleaning, testing, and

calibrating of approximately 177 United Taconite specified relays, as well as

documentation of the ‘as found’ and ‘as left’ test results.” Minnesota Power required that

“an electrician from United Taconite be available to work with [its] technician to keep a

supply of relays available for testing in a centralized location.” In June 2004, United

4
Taconite sent a purchase order to Minnesota Power that stated: “During major shutdown

Minn[esota] Power to calibrate 177 protective relays at plant per quote from . . .

4/27/2004.”

Minnesota Power’s employee, Clark Lamppa, performed the relay testing in

August 2004. Lamppa has a two-year degree in industrial instrumentation from a

vocational college in Eveleth and began working for Minnesota Power in 1989. As a

relay technician, he tests, calibrates, and performs maintenance on Minnesota Power’s

and outside companies’ protective relay systems. As had been the case on earlier such

occasions, United Taconite and its electricians removed the relays from where they were

in the plant and delivered them to Lamppa for testing at a table in the expansion

substation of the plant. After Lamppa tested them, United Taconite electricians

reinstalled the relays.

Just over two years later, in September 2006, senior relay technicians from

Minnesota Power installed new panel protection relays on the two transmission lines.

Minnesota Power replaced the old mechanical relays with microprocessor-based relays.

In October 2006, United Taconite employees were servicing a ball mill motor that

had been sporadically shutting off.1 Specifically, the employees were working on a

Square D motor starter for the ball mill. On October 12, two United Taconite electronic

technicians and one United Taconite electrical engineer were attempting to fix the ball

mill in the motor control center room. At their request, the plant’s control room initiated

1
The ball mill, which is located inside the United Taconite plant, is a machine that
crushes taconite into small pieces.

5
a start-up of the ball mill and, as the mill tried to start, the technicians heard a loud noise,

saw a dense plume of black smoke, and saw a fire that looked like a blowtorch coming

from the ball mill. The technicians escaped the motor control center, but the electrical

engineer was unable to escape and died at the scene from smoke inhalation.

The United States Department of Labor Mine Safety and Health Administration

(MSHA) investigated the accident. MSHA determined that

[o]n October 12, 2006 at about 12:44 p.m., a short circuit
occurred in the 4160 volt power lines located in the motor
control center. These power lines distributed electrical power
to ball mill Nos. 3, 4 and 5. The Allis Chalmers air-magnetic
circuit breaker, located in the substation distribution room,
which protected the power lines for ball mill Nos. 3, 4 and 5,
failed to operate when a short circuit occurred. This short
circuit resulted in sustained arcing that enveloped the motor
control center room for more than three minutes, resulting in
the death of a miner.

MSHA also determined that “[t]he oil circuit breakers located in the substation, which

were used to protect transformer No. 5 and associated power lines from excessive

overloads, failed to clear a fault that occurred in the substation distribution room.” The

failure of these oil circuit breakers “allowed a sustained fault in the substation

distribution room that lasted for more than three minutes,” and “[t]he electrical circuit

feeding the substation distribution room, which distributed electrical power to the motor

control center room, was not protected with overload protection.” MSHA concluded that

“[t]he accident occurred because the mine operator failed to ensure that the air-magnetic

circuit breaker provided over-current protection for the electrical circuit. The severity of

6
this accident was impacted by the mine operator’s failure to also provide circuit overload

protection for the plant’s incoming power feed circuit.”

Insurers paid over $19 million to United Taconite to reimburse it for property

damage that resulted from the October 2006 fire. Insurers, subrogated to the rights of

United Taconite, sued Minnesota Power and Schneider Electric USA, Inc., alleging

breach of contract, negligence, willful and wanton negligence, and breach of warranty

against both companies. Insurers claim damages “in excess of $19,881,585.”2

Insurers later withdrew their breach-of-warranty claims against Minnesota Power.

Minnesota Power moved for summary judgment on the remaining claims. The district

court granted the motion for summary judgment, holding that no evidence shows that

Minnesota Power breached any contract and that “[t]he parties’ contracts provide the only

source of duties owing to [United Taconite] by Minnesota Power.” The district court

thus concluded that “[t]here is no evidence of any separate tort-related duties arising by

operation of law.” This appeal followed.

DECISION

Insurers challenge the district court’s dismissal of their negligence claims,

asserting that Minnesota Power “negligently breached common-law duties” by failing to

exercise reasonable care “while performing its contracts” at the United Taconite plant.

Specifically, insurers contend that Minnesota Power was negligent in performing

2
Schneider Electric manufactures, services, and sells electrical equipment in Minnesota.
Insurers settled their claims with Schneider Electric during mediation, and those claims
are not part of this appeal.

7
protective-relay maintenance in 2004 and in maintaining the protection level of the oil

circuit breakers. Insurers do not argue that Minnesota Power was negligent in its

provision of electricity under the ESA and do not challenge the district court’s decisions

on their contract claims. Minnesota Power responds that it had no duties to United

Taconite independent from those created by contract.

In considering a district court’s grant of summary judgment, we review de novo

whether the district court properly applied the law and whether any genuine issues of

material fact preclude summary judgment. Riverview Muir Doran, LLC v. JADT Dev.

Grp., LLC, 790 N.W.2d 167, 170 (Minn. 2010). No genuine issue of material fact exists

“Where the record taken as a whole could not lead a rational trier of fact to find for the

nonmoving party.” DLH, Inc. v. Russ, 566 N.W.2d 60, 69 (Minn. 1997) (quotation

omitted). “[W]hen the nonmoving party bears the burden of proof on an element

essential to the nonmoving party’s case, the nonmoving party must make a showing

sufficient to establish that essential element” to survive summary judgment. Id. at 71.

“Negligence is generally defined as the failure to exercise such care as persons of

ordinary prudence usually exercise under such circumstances.” Domagala v. Rolland,

805 N.W.2d 14, 22 (Minn. 2011) (quotation omitted). A defendant is entitled to

summary dismissal of a negligence claim when “the record reflects a complete lack of

proof on any of the four essential elements of the claim: (1) the existence of a duty of

care, (2) a breach of that duty, (3) an injury, and (4) the breach of the duty being the

proximate cause of the injury.” Gradjelick v. Hance, 646 N.W.2d 225, 230 (Minn. 2002).

8
I. Duty of Care

“The existence of a duty of care is a threshold question because a defendant cannot

breach a nonexistent duty.” Doe 169 v. Brandon, 845 N.W.2d 174, 177 (Minn. 2014).

Whether a duty exists is a legal question, which we review de novo. Glorvigen v. Cirrus

Design Corp., 816 N.W.2d 572, 581 (Minn. 2012).

A party is not liable for damages in tort “if the duty breached was merely imposed

by contract, and not imposed by law.” Id. at 584 (quotations omitted). The difference

between a tort action and a contract action is “whether a duty has been breached other

than one established by contract.” D & A Dev. Co. v. Butler, 357 N.W.2d 156, 158

(Minn. App. 1984). These actions protect different interests:

Through a tort action, the duty of certain conduct is imposed
by law and not necessarily by the will or intention of the
parties. The duty may be owed to all those within the range
of harm, or to a particular class of people. On the other hand,
contract actions protect the interests in having promises
performed. Contract obligations are imposed because of
conduct of the parties manifesting consent, and are owed only
to the specific parties named in the contract.

80 S. Eighth St. Ltd. P’ship v. Carey-Canada, Inc., 486 N.W.2d 393, 395-96 (Minn.

1992).

As discussed below, we hold that Minnesota Power did not owe United Taconite a

duty to warn or a duty to perform beyond the contractual duties upon which the

contracting parties had agreed.

9
A. Relay Maintenance

Insurers contend that the work performed on the protective relays by Minnesota

Power in 2004 gave rise to tort duties to United Taconite. They assert that Minnesota

Power should have alerted United Taconite “to the danger that [the protective relays’ tap

setting of 0.2] could reduce the tripping reliability of the circuit”; that Minnesota Power

should have changed the tap setting; and that Minnesota Power should have performed a

system-function test during the protective-relay maintenance. It is undisputed that the

contract between Minnesota Power and United Taconite for the 2004 service—consisting

of the April 2004 proposal and the June 2004 purchase order—does not require any of

these actions by Minnesota Power. And insurers agree that the actual testing of the relays

was not negligently performed as called for by the parties’ agreement. We conclude that

Minnesota Power did not owe United Taconite any common-law duties to either warn or

perform additional duties outside of the 2004 contract for maintenance on the protective

relays.

“Generally, no duty is imposed on an individual to protect another from harm,

even when she realizes or should realize that action on her part is necessary for another’s

aid or protection.” Bjerke v. Johnson, 742 N.W.2d 660, 665 (Minn. 2007) (quotation

omitted). A duty may arise if the defendant’s own conduct creates a foreseeable risk of

harm to a foreseeable plaintiff or if the parties are in a special relationship and the harm is

foreseeable. Domagala, 805 N.W.2d at 23.

Insurers do not argue that any affirmative act of Minnesota Power during the 2004

maintenance caused injury. See Brandon, 845 N.W.2d at 178 (“When we refer to the

10
defendant’s own conduct, we mean misfeasance, which is active misconduct working

positive injury to others.” (quotations omitted)). Rather, insurers contend that Minnesota

Power had a duty to warn or protect United Taconite from harm created by someone

other than Minnesota Power. See Domagala, 805 N.W.2d at 23-24. Clark Lamppa, the

relay technician who performed the maintenance in 2004, tested the relays as he found

them. It is undisputed that Lamppa did not establish the 0.2 setting, and the parties’ 2004

agreement made no reference to determining whether the 0.2 setting was proper. It is

undisputed that relay engineers determine the proper settings and create “setting sheets”

that list the proper settings.3 Lamppa is not a relay engineer, and Minnesota Power did

not hire a relay engineer as part of the 2004 work. Fact issues exist as to which company

was supposed to create the setting sheets originally, but it is undisputed that, at the time

of the 2004 testing, the setting sheets were not available to Lamppa and that Lamppa

informed United Taconite that the setting sheets were not available. Lamppa and

Minnesota Power were to “calibrate 177 protective relays.” Insurers make no claim that

the calibration was either not done or was done incorrectly.

The essence of insurers’ claims is that Minnesota Power is liable for its

“nonfeasance.” Nonfeasance, or nonaction, is “passive inaction or a failure to take steps

to protect others from harm.” Domagala, 805 N.W.2d at 22. Inaction amounts to

3
Although insurers allege in their brief that the 2000 “Power System Study” “contains
the information necessary to determine the proper settings for a protective relay as . . .
located,” the engineer who prepared the 2000 study was deposed, and he testified that the
study “doesn’t hold the official settings.” He explained that “the company that owns the
protective relays needs to maintain settings, and so they need to have the final settings.”
And insurers point to no evidence in the record contrary to this testimony.

11
negligence only when the defendant “has a duty to act for the protection of others.” Id. at

23.4

We next consider whether United Taconite and Minnesota Power had a special

relationship such that Minnesota Power owed United Taconite a duty to protect or warn.

Special relationships may arise in circumstances such as (1) between “parents and

children, masters and servants, possessors of land and licensees, and common carriers

and their customers”; (2) “when an individual, whether voluntarily or as required by law,

has custody of another person under circumstances in which that other person is deprived

of normal opportunities of self-protection”; and (3) “when an individual assumes

responsibility for a duty that is owed by another individual to a third party.” Bjerke, 742

N.W.2d at 665 (quotations omitted). A district court considers certain factors when

determining whether a special relationship exists, including “the vulnerability and

dependency of the individual, the power exerted by the defendant, and the degree to

which the defendant has deprived the plaintiff of her ordinary means of protection.”

Becker v. Mayo Found., 737 N.W.2d 200, 213 (Minn. 2007). A “special relationship” is

defined as a “nonfiduciary relationship having an element of trust, arising esp[ecially]

when one person trusts another to exercise a reasonable degree of care and the other

knows or ought to know about the reliance.” Black’s Law Dictionary 1402 (9th ed.

2009).

4
For a discussion of the limitations on tort remedies in Minnesota in suits between
contracting parties and the doctrinal basis for those limitations, see Torts: An Alternative
Approach to Glorvigen v. Cirrus Design Corp., 40 Wm. Mitchell L. Rev. 224, 229-33
(2013).

12
Insurers have not shown that United Taconite had a special relationship with

Minnesota Power so as to give rise to a duty to perform above and beyond the 2004

contract. United Taconite hired Minnesota Power to provide specific services as set forth

in the April 2004 proposal. As the district court correctly observed, the 2004 contract

called for Minnesota Power to perform “technician-level work,” not “engineering

services.” Our courts are “generally cautious and reluctant to impose a duty to protect

between those conducting business with one another.” Funchess v. Cecil Newman Corp.,

632 N.W.2d 666, 674 (Minn. 2001). Insurers also have not established that Minnesota

Power knew or should have known that United Taconite trusted or relied upon Minnesota

Power to warn of the possibility of the relay settings being too low, to change such a

setting if discovered, or to perform a full system-function test, none of which was

required under the contract. And on this record, there is no showing that United Taconite

expected Minnesota Power to reengineer its plant or do anything beyond the scope of the

parties’ agreement (which called for Minnesota Power only to clean, test, and calibrate

the relays).

Moreover, the 2006 accident was not foreseeable at the time of the 2004

maintenance. See Bjerke, 742 N.W.2d at 667 (“Even where a special relationship exists,

a duty is only imposed if the resulting injury was foreseeable.”). The accident occurred

over two years after the maintenance work and involved equipment that United Taconite

owned and maintained. Minnesota Power’s relay engineer testified in deposition that

recommended relay settings may change over time. Insurers’ own expert opined that the

0.2 setting decreased the reliability of the relays—he did not opine that it created a

13
probable risk of specific danger. Additionally, Minnesota Power replaced relays

associated with the transmission lines one month before the accident. Even if Minnesota

Power knew of the potential risk of the 0.2 setting, and even if it had superior knowledge

of the risk (which the record does not establish), “superior knowledge of a dangerous

condition by itself, in the absence of a duty to provide protection, is insufficient to

establish liability in negligence.” Harper v. Herman, 499 N.W.2d 472, 475 (Minn.

1993).

Because no special relationship existed between United Taconite and Minnesota

Power, Minnesota Power owed no common-law duties to United Taconite to warn of a

possibly low setting, to change such a setting, or to perform a full system-function test.

B. Oil Circuit Breakers

Insurers also contend that, because Minnesota Power assumed “exclusive control”

over the oil circuit breakers, it had duty to ensure that the oil circuit breakers would

protect the United Taconite plant. In their reply brief, Insurers narrow the issue: “[T]he

issue is not whether the [oil circuit breakers] themselves failed to operate, but whether

Minnesota Power should have warned the plant that the relays controlling the [oil circuit

breakers] did not really include a 50P [protective relay] that would have provided

overcurrent protection . . . .”

“One who voluntarily assumes a duty will be liable for damages resulting from

failure to use reasonable care.” Funchess, 632 N.W.2d at 674. In other words, “one who

assumes to act, even though gratuitously, may thereby become subject to the duty of

acting carefully, if he acts at all.” State by Humphrey v. Philip Morris Inc., 551 N.W.2d

14
490, 493 (Minn. 1996). “Thus, a person may, by conduct, assume a duty where one did

not previously exist and be liable for the failure to exercise due care in the performance

of that duty.” Id. at 494.

Insurers provide no evidence that Minnesota Power exercised exclusive control of

the oil circuit breakers or assumed duties in addition to its contractual duties. The record

includes inspection and maintenance reports for oil circuit breakers from various dates in

the 1980s, 1990s, and 2000s, and purchase orders from Eveleth Mines and United

Taconite to Minnesota Power from 1997, 2002, and 2005. But these reports and purchase

orders are limited to maintenance work, and Insurers do not contend that Minnesota

Power was negligent in providing that maintenance.

Even if Minnesota Power knew that there was no specific overcurrent protection,

Insurers have not shown that Minnesota Power had an affirmative duty to protect or warn

United Taconite of the plant’s own limitations. See Harper, 499 N.W.2d at 475. In fact,

it is undisputed that in 1997, Minnesota Power did recommend to United Taconite that it

perform a function test of the circuits and associated breakers to verify their functionality.

Minnesota Power did not design or create the plant’s electrical system, and, as discussed

above, Insurers have not established a special relationship between United Taconite and

Minnesota Power.

II. Willful and Wanton Negligence

Willful and wanton negligence is “a failure to exercise ordinary care after

discovering another in a position of peril.” Bryant v. N. Pac. Ry. Co., 221 Minn. 577,

585, 23 N.W.2d 174, 179 (1946). “[I]f a person fails to exercise ordinary care after (1)

15
the peril was present, and (2) the peril was known to the person, his ordinary negligence

rises to a higher level of negligence—willful and wanton negligence.” Gage v. HSM

Elec. Prot. Servs., Inc., 655 F.3d 821, 826 (8th Cir. 2011) (applying Minnesota law).

Insurers have not established that Minnesota Power owed a tort duty to United

Taconite. Such a duty is required not only for ordinary negligence, but also for willful

and wanton negligence. Insurers’ claim that Minnesota Power committed willful and

wanton negligence also fails.

III. Statute of Limitations and Expert Affidavit

Because we hold that the district court properly concluded that Insurers’

negligence claims are without merit, we do not reach Minnesota Power’s alternative

arguments that the two-year limitation period under Minn. Stat. § 541.051 (2012) applies

or that Insurers did not timely serve an affidavit of expert disclosure under Minn. Stat.

§ 544.42 (2012).

Affirmed.

16

Semantically similar Other opinions on related ground

Ranked by cosine-distance similarity of voyage-law-2 embeddings — these read closest to this opinion's legal subject matter, not just by keyword overlap.

Docket Court Filed Disposition Case
A14-47 Minn. Ct. App. 2015-03-09 Affirmed Scott Alan Wenker by Jeffrey Wenker, Trustee v. Xcel Energy, Inc., City of Cott…
A14-1369 Minn. Ct. App. 2015-06-01 Affirmed Fred Newell v. Timothy Eide, and third party v. Norcostco, Inc., Third Party
No. A09-1945 Minn. 2011-10-26 Reversed and remanded Domagala v. Rolland
A15-1188 Minn. 2017-07-12 Granted Montemayor v. Sebright Products, Inc.
A15-1188 Minn. Ct. App. 2016-03-28 Affirmed Nereus Montemayor v. Sebright Products, Inc., d/b/a Bright Technologies, and th…