Andrew Geist, individually and as parent and natural guardian of minor, T.G., Appellant,
Authorities cited
Identified automatically; this list may not be exhaustive.
- Montemayor v. Sebright Products, Inc. 898 N.W.2d 623
- Star Centers, Inc. v. Faegre & Benson, L.L.P. 644 N.W.2d 72
- Fenrich v. Blake Sch. 920 N.W.2d 195
- Doe 169 v. Brandon 845 N.W.2d 174
- In re Disciplinary Action Against Romer 805 N.W.2d 14
- Glorvigen v. Cirrus Design Corp. 816 N.W.2d 572
- Keiper v. Anderson 165 N.W. 237
- Warren v. Dinter 926 N.W.2d 370
- Senogles v. Carlson 902 N.W.2d 38
- Palladium Holdings, LLC v. Zuni Mortgage Loan Trust 2006-OA1 775 N.W.2d 168
- City of Willmar v. Short-Elliott-Hendrickson, Inc. 512 N.W.2d 872
- In re Individual 35W Bridge Litigation 806 N.W.2d 811
Opinion text
This opinion will be unpublished and
may not be cited except as provided by
Minn. Stat. § 480A.08, subd. 3 (2018).
STATE OF MINNESOTA
IN COURT OF APPEALS
A19-0789
Andrew Geist,
individually and as parent and natural guardian of minor, T.G.,
Appellant,
vs.
East Central Energy,
Appellant,
One Way Tree Service, Inc.,
Respondent,
Northland Process Piping, Inc., et al.,
Defendants.
Filed November 25, 2019
Affirmed
Worke, Judge
Kanabec County District Court
File No. 33-CV-17-211
Britton D. Weimer, William C. Weeding, Weimer & Weeding PLLC, Bloomington,
Minnesota (for appellants)
Peter M. Waldeck, Jason M. Stoffel, Waldeck Law Firm P.A., Minneapolis, Minnesota (for
respondent)
Considered and decided by Worke, Presiding Judge; Connolly, Judge; and
Klaphake, Judge.*
* Retired judge of the Minnesota Court of Appeals, serving by appointment pursuant to
Minn. Const. art. VI, § 10.
2
U N P U B L I S H E D O P I N I O N
WORKE, Judge
Appellants argue that the district court erred by granting summary judgment to
respondent. We affirm.
FACTS
In September 2014, 13-year-old T.G. climbed a tree and suffered an electric shock,
presumably from coming into contact with appellant East Central Energy’s (ECE)
powerline. ECE thereafter inspected the tree and the powerline and discovered that the
upper, primary powerline was not touching the tree, but the lower, neutral line was touching
the tree.
In July 2017, appellant Andrew Geist, individually and as paren t and natural
guardian of T.G., sued ECE, the property owner, the lessee, and respondent One Way Tree
Service Inc. (One Way), who was contractually responsible for vegetation m anagement
around ECE’s powerlines. ECE filed a cross -claim against One Way, seeking indemnity
and/or contribution. One Way moved for summary judgment.
Central to the summary -judgment motion was ECE and One Way’s contract. In
2009, One Way entered into a contract with ECE for right-of-way vegetation management
and clearing around ECE’s powerlines. Under the contract, One Way was obligated to
prune trees within a landscape 1 “to the extent, when necessary, that the growing points of
the trees or limbs will remain a minimum of two feet from the nearest conductor until the
1 A contractually defined term whose applicability is not contested.
3
next scheduled maintenance. The expected growth characteristics as well as pruning
responses shall be taken into consideration pruning for the particular species.” ECE also
provided One Way with a sheet of specific guidelines for trimming individual species of
trees, but it is unclear whether those guidelines were incorporated into the contract.
One Way trimmed the tree in 2010 pursuant to its contract with ECE. The employee
who trimmed the tree could not recall how much clearance he provided at that time, but
testified that it was in compliance with the six-year clearance guidelines provided by ECE.
The One Way employee also testified that he flagged the tree for removal, but it was not
removed because presumably the landowner either failed to respond to the removal notice
or instructed One Way not to remove it. Therefore, One Way pruned the tree rather than
removing it.
Under the contract, “an ECE representative will inspect a project for final
acceptance and payment. After inspection by ECE, any deficient or defective work that
has not been previously recorded on Variance Report shall be remedied at the contractor’s
expense prior to final payment.” An ECE employee testified that the tree was flagged as
deficient on his inspection report, but only due to a dead branch overhanging the line, which
he agreed was not relevant to the 2014 incident. The project passed inspection as evidenced
by the fact that One Way was paid for its services.
The district court granted One Way’s motion for summary judgment after
concluding that One Way owed no duty to T.G. following satisfactory completion of its
work in 2010. The parties eventually settled the remaining claims. This appeal followed.
4
D E C I S I O N
Appellants2 argue that the district court erred by granting One Way summary
judgment. “We review the grant of summary judgment de novo to determine whether there
are genuine issues of material fact and whether the district court erred in its application of
the law.” Montemayor v. Sebright Prods., Inc., 898 N.W.2d 623, 628 (Minn. 2017)
(quotation omitted). “We review the evidence in the light most favorable to the party
against whom summary judgment was granted.” STAR Ctrs., Inc. v. Faegre & Benson,
L.L.P., 644 N.W.2d 72, 76-77 (Minn. 2002). Summary judgment is not appropriate “when
reasonable persons might draw different conclusions from the evidence presented.”
Montemayor, 898 N.W.2d at 628 (quotation omitted).
Geist’s negligence claim
Geist asserts that factual disputes exist that should have precluded summary
judgment on his negligence claim . In order to prevail on a negligence claim, a plaintiff
must establish: “(1) the existence of a duty of care, (2) a breach of that duty, (3) an injury,
and (4) the breach of that duty being the proximate cause of the injury.” Fenrich v. The
Blake School, 920 N.W.2d 195, 201 (Minn. 2018) (quotation omitted).
The district court determined that One Way owed no duty to Geist or T.G. following
the completion of its work and ECE’s approval of that work. “The existence of a duty of
care is a threshold question because a defendant cannot breach a nonexistent duty.” Doe
2 In May 2019, the district court dismissed all remaining claims pursuant to the parties’
stipulation. Appellants Geist and ECE are now represented by the same counsel.
5
169 v. Brandon, 845 N.W.2d 174, 177 (Minn. 2014). Appellate courts review the existence
of a duty of care de novo. Domagala v. Rolland, 805 N.W.2d 14, 22 (Minn. 2011).
Geist argues that there are disputed material facts regarding whether One Way was
negligent in (1) trimming around the neutral line, (2) trimming around the primary
powerline, and (3) following up with the property owners regarding its removal notice.
Geist and the expert affidavit of Ronald May repeatedly cite One Wa y’s contractual
trimming and removal-tagging requirements to support the assertion that there are disputed
material facts regarding Geist’s tort negligence claim. 3 This confusion between tort and
contract frequently occurs in the arguments presented to both the district court and this
court.
Geist argues that One Way violated a duty to T.G. and himself when it breached a
contractual requirement to have a minimum of two feet of clearance between the growing
points of trees or limbs and conductors until the next scheduled maintenance. However, as
nonparties to the contract, One Way o wed no contractual duty to Geist or T.G., and ECE
did not bring a cross-claim for breach of contract. And “a party is not responsible for
damages in tort if the duty breached was merely . . . imposed by contract, and not imposed
by law.” Glorvigen v. Cirrus Design Corp., 816 N.W.2d 572, 584 (Minn. 2012)
(quotations omitted). “Where a party cannot prove that the duty at issue arose independent
3 May stated that “[i]t is the standard of the industry for electric utilities to enter into
contracts with experts in the field of vegetation management . . . .” May then relied solely
on the contractual standard of care and did not provide any facts regarding a standard of
care that exists independent of the bargained -for provisions of the parties’ contract. For
example, he conclude d: “Thus, One Way’s non-compliance with the contract and
contractual standard of care directly contributed to [T.G.’s] injuries.”
6
of a contract, Minnesota law precludes [that party] from recovering in negligence based
upon breach of [that duty.]” Id. (quotation omitted).
Geist argues that in professional-negligence actions, the contract between the parties
can be used to define the duty of care for the professional. In support of this assertion,
Geist relies on Keiper v. Anderson, 165 N.W. 237, 239 (Minn. 1917), but Keiper and the
related cases cited by Geist do not support his argument that a contractual duty can be used
to define the professional standard of care owed to a person who is not a party to the
contract. In fact, in Keiper, the supreme court stated that “[i]t seems to us to make no
difference whether the duty to use due care is one imposed directly by law, or exists
because of the contract relation of the parties.” 165 N.W.2d at 239 (emphasis added).
Geist has no contractual relation with One Way, and therefore the contract between ECE
and One Way is immaterial to Geist’s tort negligence claim.
Geist argued to the district court that he was a third-party beneficiary of the contract
between One Way and ECE and thus was entitled to rely on the contractual trimming and
removal-notice requirements. The district court held that Geist was not a third- party
beneficiary, and Geist did not appeal that determination. Therefore, evidence pertaining to
One Way’s obligations under its contract with ECE is not material to Geist’s negligence
action, and accordingly cannot create a dispute of material fact. On this basis, the district
court did not err by granting One Way summary judgment on Geist’s common-law
negligence claim.
The district court also found that Geist failed to establish the threshold issue of the
existence of a duty because, once One Way’s work on the project was completed in 2010,
7
it lacked authority to reenter the property and inspect its wo rk. Therefore, the duty to
maintain the vegetation around the powerlines “fell primarily, if not entirely, on ECE.”
In Domagala, the supreme court recognized that it has “imposed a duty of
reasonable care to prevent foreseeable harm when the defendant’s conduct creates a
dangerous situation.” 805 N.W.2d at 26. “Foreseeability of injury is a threshold issue
related to duty that is ordinarily properly decided by the court prior to submitting the case
to the jury.” Id. at 27 (quotation omitted). “To determine whether an injury was
foreseeable, we look to the defendant’s conduct and ask whether it was objectively
reasonable to expect the specific danger causing the plaintiff’s injury.” Id. The district
court did not specifically address the issue of reasonable foreseeability in its determination
that One Way owed no duty to Geist or T.G. However, as stated in Domagala, reasonable
foreseeability is related to the issue of duty. Id. at 26. “In close cases, the issue of
foreseeability should be submitted to the jury.” Warren v. Dinter, 926 N.W.2d 370, 378
(Minn. 2019) (quotation omitted); see also Fenrich, 920 N.W.2d at 205; Senogles v.
Carlson, 902 N.W.2d 38, 48 (Minn. 2017); Montemayor, 898 N.W.2d at 630.
This is not a close case. As with the issue of duty, when viewed in the light most
favorable to Geist, there is no evidence presented by Geist that pointed to a reasonably
foreseeable risk of injury to T .G. Geist again states that genuine disputes of material fact
exist regarding One Way’s purported breach of its contractual obligations to ECE, and
asserts that harm to T.G. was reasonably foreseeable as a result of that breach . Because
Geist presented no evidence regarding the foreseeability of harm to T.G. in 2014 due to
8
One Way’s purportedly negligent trimming in 2010, the district court’s grant of summary
judgment to One Way on Geist’s negligence claim was not erroneous.
ECE’s cross-claims
The parties argued ECE’s cross-claim for indemnity during the summary-judgment
hearing, but did not argue ECE’s cross -claim for contribution. The district court did not
specifically address ECE’s cross-claims, merely ruling that the claims against One Way
were dismissed with prejudice. A district court’s silence on a motion is treated as a denial.
Palladium Holdings, LLC v. Zuni Mortg. Loan Tr. 2006-OA1, 775 N.W.2d 168, 178 (Minn.
App. 2009), review denied (Minn. Jan. 27, 2010). ECE challenges the district court’s
denial of its cross-claims.
A claim for contribution-indemnity is an independent cause of action. City of
Willmar v. Short-Elliott-Hendrickson, Inc., 512 N.W.2d 872, 874 (Minn. 1994).
“[C]ontribution-indemnity is not based on contract or tort, although either may secondarily
be involved, but on one party paying more than its fair share of a common liability.” Id .
“The elements of contribution are common liability of joint tortfeasors to an injured party
and the payment by one of the tortfeasors of more than his share of that liability.” In re
Individual 35W Bridge Litig., 806 N.W.2d 811, 815 (Minn. 2011) (quotation om itted).
“Contribution is an equitable remedy . . . .” Id. Having affirmed the district court’s grant
of summary judgment to One Way on Geist’s negligence claim, there is no common
liability between One Way and ECE as joint tortfeasors, as judgment was entered in favor
of One Way on the merits of Geist’s claim. Therefore, the district court did not err by
granting One Way summary judgment on ECE’s cross-claim for contribution.
9
“Indemnity applies when, among other situations, a party fails to discover or prevent
another’s fault and, consequently, pays damages for which the other party is primarily
liable.” City of Willmar, 512 N.W.2d at 874. Unlike Geist’s negligence claim or ECE’s
contribution claim, ECE’s indemnity claim is secondarily governed by the terms of One
Way and ECE’s contract. According to the indemnification provision in the contract,
“nothing herein shall be construed as making [One Way] liable for any injury, death, loss,
damage, or destruction caused by the sole negligence of [ECE].”
Having affirmed the grant of summary judgment to One Way on Geist’s negligence
claim, the only remaining liability for One Way to indemnify in this action is Geist’s
negligence claim against ECE. Geist sued ECE and One Way as joint tortfeasors in
negligence only. ECE then cross-claimed against One Way to indemnify any liabilities it
may have to Geist. The district court granted One Way summary judgment on the merits
of Geist’s negligence claim, which, for the purposes of this appeal, leaves only Geist’s
negligence claim against ECE, which the parties settled. Thus, even though
indemnification is an independent action, the only remaining liability that ECE seeks to
indemnify itself against is a claim for its sole negligence, which One Way is not obligated
to indemnify under the contract. Therefore, the district court did not err in granting One
Way summary judgment on ECE’s cross-claim for indemnification.
Affirmed.