State of Minnesota by Smart Growth Minneapolis, et al., Respondents,
The holding in the court’s own words
13 In sum, we conclude that, under Smart Growth, it was appropriate for the district court to base its MERA analysis on the presumption of a full build-out under the Plan. We therefore conclude that the district court did not abuse its discretion in this regard.
Quoted verbatim from the opinion — no paraphrase, nothing generated. Not yet human-reviewed. How we find the holding.
Cited by
- State of Minnesota by Smart Growth Minneapolis, a Minnesota nonprofit corporation v. City of … 7 N.W.3d 418 Minn. Ct. App. 2024
Authorities cited
Identified automatically; this list may not be exhaustive.
- 954 N.W.2d 584 not in our corpus
- 941 N.W.2d 741 not in our corpus
- 934 N.W.2d 130 not in our corpus
- Williams v. National Football League 794 N.W.2d 391
- Graupmann v. Rental Equipment & Sales Co. 425 N.W.2d 861
- State Ex Rel. Schaller v. County of Blue Earth 563 N.W.2d 260
- Stansell v. City of Northfield 618 N.W.2d 814
- In re Disciplinary Action Against Rambow 850 N.W.2d 682
- Sigurdson v. Isanti County 448 N.W.2d 62
- Hebert v. City of Fifty Lakes 744 N.W.2d 226
- Krmpotich v. City of Duluth 483 N.W.2d 55
- State ex rel. Swan Lake Area Wildlife Ass'n v. Nicollet County Board of County Commissioners 799 N.W.2d 619
- State Ex. Rel. Wacouta Township v. Brunkow Hardwood Corp. 510 N.W.2d 27
- Cherne Industrial, Inc. v. Grounds & Associates, Inc. 278 N.W.2d 81
- Voluntary Dissolution of Quintar, Inc. v. MBC, Inc. 397 N.W.2d 594
- Marriage of Stich v. Stich 435 N.W.2d 52
Opinion text
This opinion is nonprecedential except as provided by
Minn. R. Civ. App. P. 136.01, subd. 1(c).
STATE OF MINNESOTA
IN COURT OF APPEALS
A22-0852
State of Minnesota by Smart Growth Minneapolis, et al.,
Respondents,
vs.
City of Minneapolis,
Appellant.
Filed December 27, 2022
Affirmed in part, reversed in part, and remanded
Larkin, Judge
Hennepin County District Court
File No. 27-CV-18-19587
Jack Y. Perry, Maren Forde, Brayanna J. Bergstrom, Taft Stettinius & Hollister LLP,
Minneapolis, Minnesota; and
Timothy J. Keane, Kutak Rock LLP, Minneapolis, Minnesota; and
Nekima V. Levy-Pounds, Minneapolis, Minnesota (for respondents)
Kristyn Anderson, Minneapolis City Attorney, Ivan Ludmer, Kristin R. Sarff, Assistant
City Attorneys, Minneapolis, Minnesota (for appellant)
Ann K. Bloodhart, David Theisen, George N. Henry, Metropolitan Council Office of
General Council, St. Paul, Minnesota (for amicus curiae Metropolitan Council)
Michelle Weinberg, Sam Ketchum, Kennedy & Graven, Chtd., Minneapolis, Minnesota
(for amicus curiae Sierra Club)
David J. Zoll, R. David Hahn, Lockridge Grindal Nauen P.L.L.P., Minneapolis, Minnesota
(for amicus curiae Neighbors for More Neighbors and Sustain St. Paul)
Jay Eidsness, Kevin S. Reuther, Minnesota Center for Environmental Advocacy, St. Paul,
Minnesota (for amicus curiae Minnesota Center for Environmental Advocacy)
2
Considered and decided by Ross, Presiding Judge; Larkin, Judge; and Bryan, Judge.
NONPRECEDENTIAL OPINION
LARKIN, Judge
In this post-remand appeal, appellant-city challenges the district court’s grant of
summary judgment and injunctive relief to respondents on their claim under the Minnesota
Environmental Rights Act (MERA), Minn. Stat. §§ 116B.01 -.13 (2022). We affirm the
grant of summary judgment to respondents. But we reverse and remand the order for
injunctive relief because the district court did not make adequate findings to enable
appellate review.
FACTS
This is the second appeal in this MERA action brought by respondents Smart
Growth Minneapolis, Audubon Chapter of Minneapolis, and Minnesota Citizens for the
Protection of Migratory Birds to challenge the Minneapolis 2040 comprehensive plan as
adopted by respondent City of Minneapolis. The facts underlying the action are recited in
a previous supreme court decision, and we do not fully restate them here. See State by
Smart Growth Minneapolis v. City of Minneapolis, 954 N.W.2d 584, 587-89 (Minn. 2021)
(Smart Growth).
Respondents’ MERA claim is based on a presumption that there will be a “full build-
out”1 of the 2040 Plan that will cause significant environmental effects. Respondents
1 Although respondents assert that the 2040 Plan must be evaluated based on a “full build-
out,” they do not define this term, and their expert’s analysis appears to evaluate the
potential environmental effects of some but not all of the development that could be
allowed under the 2040 Plan.
3
asserted this theory in their complaint and attached an expert report b y Kristen Pauly (the
Pauly Report) that “calculates a number of projections under the Plan, including increased
residential density, traffic trips per day, volume of water runoff, and contaminant loads on
the storm sewer system,” based on the full build-out assumption. Smart Growth, 954
N.W.2d at 588. As relief, respondents sought to enjoin implementation of the 2040 Plan
“unless and until City satisfies its MERA-required burden, presumably through a voluntary
environmental review (i.e., [environmental-impact statement] or [alternative urban
areawide review]).”
The district court granted the city’s motion to dismiss respondents’ MERA claim,
reasoning that, because comprehensive plans are exempt from environmental-review
requirements unde r an administrative rule implementing the Minnesota Environmental
Policy Act, see Minn. R. 4410.4600, subp. 26 (2021), respondents could not state a claim
under MERA seeking environmental review as relief. The district court also concluded
that respondents could not demonstrate causation under MERA because they had not
challenged a discrete, identifiable project. Respondents appealed, and this court affirmed.
See State by Smart Growth v. City of Minneapolis, 941 N.W.2d 741 (Minn. App. 2020),
rev’d, 954 N.W.2d 584 (Minn. 2021). Respondents petitioned for further review, which
the supreme court granted. Smart Growth, 954 N.W.2d at 589.
In Smart Growth, the supreme court held “[1] that adoption of a comprehensive plan
can be the subject of a MERA claim an d [2] that [respondents’] allegations [were]
sufficient to state a claim for which relief can be granted under MERA.” Id. at 587. In
concluding that respondents’ allegations were sufficient, the supreme court explained that
4
respondents’ complaint alleged that the 2040 Plan was likely to materially adversely affect
the environment and that a full build-out of the plan would cause “dramatic” effects. Id. at
596. The supreme court acknowledged that “the projections supporting [respondents’]
allegations are based on a full build-out” but reasoned: “that build-out is what the actual
land-use criteria contained in the Plan allows for; [respondents are] not speculating about
the type of actions that will result from other future comprehensive plans that would follow
the 2040 Plan.” Id. The supreme court concluded that respondents’ allegations were
sufficient to support a MERA claim and thus reversed and remanded with instructions to
the district court to reinstate respondents’ complaint. Id. at 596-97.
On remand following discovery, respondents and the city each moved for summary
judgment. Respondents argued that they had established a prima facie case under MERA,
and that the city had not rebutted that prima facie case or established an affirmative defense.
The city argued that respondents failed to present evidence sufficient to meet their prima
facie burden, and that, even if they could meet that burden, there existed genuine issues of
material fact regarding whether the city could rebut the prima facie burden or prove an
affirmative defense.
The record before the district court on summary judgment consisted of two expert
reports, attorney affidavits attaching various documents, and substantive affidavits from
city officials. Respondents continued to rely on the Pauly Report filed with their complaint,
the analysis of which is based on the presumption of a full build-out. The city submitted
an expert report and affidavits disputing the factual basis for the presumption of a full build-
5
out, but the city did not dispute Pauly’s opinion that a full build-out would cause material
adverse environmental effects.
At the hearing on the summary-judgment motions, the district court requested
submissions from the parties regarding appropriate relief should respondents prevail on
their claims. Respondents submitted proposed findings of fact and conclusions of law and
a proposed order for judgment. Respondents requested that the court enjoin the 2040 Plan
and require the city to restore the status quo ante under the city’s previous comprehensive
plan (the 2030 Plan). The city responded that it was surprised that respondents had
submitted proposed injunction language and asserted that the proposed language was not
specific enough under Minn. R. Ci v. P. 65.04 or tailored to be necessary to protect the
environment under MERA.
The district court denied the city’s motion for summary judgment, granted
respondents’ motion for summary judgment, and ordered injunctive relief. In addressing
whether respondents had established a prima facie case, the district court reasoned that the
threshold issue was “whether a presumption of an immediate full build-out is a proper basis
on which to base a MERA challenge to a comprehensive plan.” The district court then
identified a subsidiary question: “When can a [c]omprehensive [p]lan, such as the 2040
Plan, be challenged under MERA?” The district court concluded that MERA allows a
challenge to a comprehensive plan “when it is still just that—a plan” and that use of a full
build-out presumption was appropriate. H aving concluded that the presumption was
appropriate, the district court relied on the Pauly Report to determine that respondents had
made a prima facie showing under MERA.
6
The district court next addressed whether the city had submitted sufficient evidence
to rebut respondents’ prima facie showing or to support an affirmative defense and
determined that it had not. The district court discussed the opinion of the city’s retained
expert and determined that it did not discuss or rebut the Pauly Report. 2 Accordingly, the
district court concluded that respondents were entitled to summary judgment on their
MERA claim.
The district court’s order immediately enjoined the city from “any ongoing
implementation of the 2040 Plan” and required it to “immediately cease all present action
in furtherance of the 2040 Plan, unless and until the City satisfies the MERA requirements
of rebutting [respondents’] prima facie showing, or prevails in establishing an affirmative
defense, as required by MERA.” The order also required the city, within 60 days, to
restore the status quo ante relationship between the parties, as
it existed on December 4, 2018 by refraining from its
enforcement of, and any prospective enforcement of, any
aspect of the 2040 Plan, including amendments to land use
ordinances directed by the 2040 Plan, that authorize the scope
and degree of residential development that this court has
determined is likely to create adverse environmental impacts
to the Minneapolis area;
and
reinstating for its prospective enforcement both the residential
development portions of the City’s Comprehensive 2030 Plan,
2 The district court noted that the city’s failure to rebut or affirmatively defend “appears to
be due largely to tactical decisions made by the City during the course of this litigation.”
The district court observed that the city had failed to follow through on its expressed intent
to take discovery, challenge the admissibility of the Pauly Report, and submit a rebuttal to
the Pauly Report. The district court concluded: “This unfortunate strategy has left the City
bereft of any fact-based rebuttal or affirmative defense, the type of which is called for under
MERA.”
7
and the pre-December 4, 2018 land use ordinances which
implement the same residential development portions of the
2030 Plan.
The city filed a notice of appeal and a motion in district court to stay the district
court’s order pending appeal. The district court granted a stay of the order pending the
outcome of this appeal.
DECISION
I.
“This court reviews a grant of summary judgment de novo, evaluating whether
genuine issues of material fact exist and whether the district court properly applied the
law.” Friends to Restore St. Mary’s, LLC v. Church of Saint Mary, 934 N.W.2d 130, 134
(Minn. App. 2019), rev. denied (Minn. Nov. 19, 2019); see also Minn. R. Civ. P. 56.01
(“The court shall grant summary judgment if the movant shows that there is no genuine
issue as to any material fact and the movant is entitled to judgment as a matter of law.”).
3
To prevail on their MERA claim, respondents were required to show that the city’s
conduct in adopting the 2040 Plan has caused, or is likely to cause, material adverse
environmental effects. See Minn. Stat. §§ 116B.02, subd. 5, .04(b); State by Schaller v.
3 Although no judgment has been entered by the district court, we review the grant of
summary judgment as a necessary component of reviewing the district court’s grant of
injunctive relief. See Minn. R. Civ. App. P. 103.03(b) (allowing appeal from order granting
injunction), 103.04 (allowing review of order affecting order from which appeal is taken);
Williams v. Nat’l Football League, 794 N.W.2d 391, 394-9 5 (Minn. App. 2011) (stating
that “on appeal from a permanent injunction, the scope of review is limited and
encompasses the merits of the underlying claims only to the extent necessary to review
challenges to the injunction”); Graupmann v. Rental Equip. & Sales Co., 425 N.W.2d 861,
862 (Minn. App. 1988) (noting that order granting summary judgment is not appealable,
and the proper appeal is from the resulting judgment).
8
County of Blue Earth, 563 N.W.2d 260, 266 (Minn. 1997). MERA sets forth a burden-
shifting framework, under which a plaintiff is required to present a prima facie case and a
defendant must then rebut the prima facie case or offer an affirmative defense. Minn. Stat.
§ 116B.04(b). Schaller sets forth a two-part test for a MERA plaintiff’s prima facie case,
requiring a showing (1) of the existence of a protectable natural resource, and (2) that the
defendant’s conduct will or is likely to cause the pollution, impairment, or destruction of
that resource. 563 N.W.2d at 264. There is no dispute in this case that protectable natural
resources are implicated. But the city asserts that respondents failed to satisfy the second,
causation element of the Schaller test.
“MERA itself does not set forth a causation standard.” Smart Growth, 954 N.W.2d
at 595. But the caselaw requires that the causal chain not be “too speculative.” Schaller,
563 N.W.2d at 268 (affirming summary-judgment dismissal of claim alleging speculative
future noise violations); see also Stansell v. City of Northfield, 618 N.W.2d 814, 820 (Minn.
App. 2000) (affirming summary-judgment dismissal of claim alleging speculative future
harm to historic resources), rev. denied (Minn. Jan. 26, 2001). The city asserts that
respondents’ causation theory is too speculative because it relies on a presumption of full
build-out of the 2040 Plan. 4 But, as we explain below, the supreme court has already
4 The city also argues that the district court erred by granting summary judgment because
respondents failed to comply with the requirements of Minn. R. Gen. Prac. 115.03(d); see
also Minn. R. Civ. P. 56.03(a) (imposing similar requirement for citations to record). We
agree with the city that respondents failed to conform to the rules and that the
nonconformity hinders both district court and appellate court review. But we also agree
with respondents that the district court had discretion to consider the motion on the merits
notwithstanding the nonconformity. See, e.g., Minn. R. Civ. P. 56.03(c) (“The court need
9
determined that respondents’ causation theory is not speculative. See Smart Growth, 954
N.W.2d at 596.
In Smart Growth, the parties’ arguments mirrored the arguments made in this
appeal:
The City argue[d] that the Plan is a high-level planning
document—simply a statement of policies, goals, and
intentions for future development —and that adoption of the
Plan does not in and of itself cause environmental effects.
Rather, the City argues that it would need to take subsequent
actions to implement any part of the Plan before environmental
effects might occur. The City’s position is that the appropriate
time for a MERA challenge is when a specific, discrete project
is approved, and that Smart Growth’s reliance on the alleged
environmental damage from a projected full build-out of the
Plan is too speculative and tenuous. Smart Growth argue[d]
that challenging individual projects fails to capture the full
scope of the environmental effects of the Plan, and that its
MERA action is the “exclusive” opportunity for review of the
entire scope of the Plan. Smart Growth relie [d] heavily on its
expert report to support its claim that the adoption of the Plan
is “likely to cause” the environmental harm it alleges.
Id. at 595.
The supreme court stated that the question before it was “solely whether Smart
Growth’s allegations are sufficient to support the contested causation element in order to
state a claim that adoption of the Plan is likely to cause materially adverse environmental
effects.” Id. (emphasis added). The supreme court further stated that it would “determine
whether Smart Growth’s allegations based on the future projected implementation of the
2040 Plan, if true, state a legally sufficient claim for relief.” Id. at 596 (emphasis added).
consider only the cited materials, but it may consider other materials in the record.”).
Accordingly, we reject the city’s argument for reversal on this ground.
10
The supreme court recognized that Smart Growth’s allegations were based on a “full build-
out” and accepted that approach, explaining that a full build-out “is what the actual land-
use criteria contained in the Plan allows for; Smart Growth is not speculating about the
type of actions that will result from other future comprehensive plans that would follow
the 2040 Plan.” Id. (emphasis added).
The city argues that the supreme court’s decision in Smart Growth does not control
in this appeal because of its differing procedural posture. It is true that Smart Growth was
decided under the standard applicable to a motion to dismiss for failure to state a claim
whereas this appeal is governed by the standard applicable to a motion for summary
judgment. Compare Minn. R. Civ. P. 12.02(e), with Minn. R. Civ. P. 56.01. But we are
unable to discern a basis to limit to the rule 12 context the supreme court’s holding that
respondents’ claim is not speculative. The supreme court did not merely accept as true an
allegation that the plan would (as a matter of fact) be fully built out. In fact, respondents
made no such allegation. Instead, they alleged that “using the legally required assumption
of the immediate and full build-out of City per its 2040 Plan,” there would be “dramatic”
environmental impacts. (Emphasis added.) Thus, we can only conclude that the supreme
court accepted respondents’ legal conclusion that the environmental effects of the 2040
Plan must be determined based on a presumption of a full build- out. Smart Growth, 954
N.W.2d at 596. 5 The provisions of the 2040 Plan have not changed, and the supreme
5 The supreme court was not required to accept as true legal conclusions in respondents’
complaint. See Graphic Commc’ns Loc. 1B Health & Welfare Fund A v. CVS Caremark
Corp., 850 N.W.2d 682, 692 (Minn. 2014) (stating that “a legal conclusion in the complaint
does not bind us, and a plaintiff must provide more than mere labels and conclusions”);
11
court’s holding therefore remains controlling as law of the case . See Sigurdson v. Isanti
County, 448 N.W.2d 62, 66 (Minn. 1989) (“ Law of the case applies when the appellate
court has ruled on a legal issue and remanded for further proceedings on other matters.”).
We observe that the presumption of a full build-out appears to be a natural extension
of the supreme court’s recognition that the adoption of a comprehensive plan may be
challenged under MERA. Recognizing such a claim inherently introduces an added level
of speculation to a causation determination under MERA. That is so because adoption of
the policy in and of itself does not cause environmental effects. See Minn. Stat. § 473.859,
subd. 1 (2022) (requiring comprehensive plans to “contain objectives, policies, standards
and programs to guide public and private land use, development, redevelopment and
preservation for all lands and waters within the jurisdiction of the local governmental
unit”). Instead, such effects may result from implementation of the policy. See Smart
Growth, 954 N.W.2d at 596 (explaining that “a comprehensive plan has the direct effect of
controlling a city ’s land use development because the plan becomes supreme vis-à-vis
zoning ordinances”). Thus, the question becomes whether presuming full implementation
of the policy is impermissibly speculative when the alternative is predicting the likelihood
of a lesser scope of implementation. From a practical perspective, a determination
regarding the circumstances that would result from full implementation can be based on
known quantities (i.e., the number of residential parcels subject to the policy) and known
Hebert v. City of Fifty Lakes, 744 N.W.2d 226, 235 (Minn. 2008) (“We are not bound by
legal conclusions stated in a complaint when determining whether the complaint survives
a motion to dismiss for failure to state a claim.”).
12
factors (the permitted land uses under the policy). Whereas a determination regarding the
likely lesser scope of implementation must be based on predictions—which are inherently
more speculative than application of known factors to known quantities.
We also note that presuming full implementation of the policy may better serve the
purpose of MERA, which is to provide every person with “an adequate civil remedy to
protect air, water, land and other natural resources located within the state from pollution,
impairment, or destruction,” such that present and future generations may enjoy the state’s
natural resources. Minn. Stat. § 116B.01; see Smart Growth, 954 N.W.2d at 592
(emphasizing broad scope of MERA). Presuming full implementation of a land-use policy
results in broader environmental review tha n limiting review based on a prediction
regarding the likely lesser scope of implementation. As the supreme court observed in
Smart Growth:
There is some validity to Smart Growth’s argument that a
MERA challenge to the Plan itself is the only way to consider
the potential environmental effects of the entire Plan rather
than individual projects, the effects of which would necessarily
be only a portion of what Smart Growth alleges the cumulative
effects of the Plan will be.
954 N.W.2d at 596 n.17 (emphasis added).6
6 Similarly, when the supreme court considered a MERA challenge to a city council’s act
of rezoning approximately 35 acres of property from residential to commercial in
Krmpotich v. City of Duluth, the supreme court considered whether a proposed
development project would violate MERA “if completed in accordance with the council’s
actions.” 483 N.W. 2d 55, 56 (Minn. 1992) (emphasis added).
13
In sum, we conclude that, under Smart Growth, it was appropriate for the district
court to base its MERA analysis on the presumption of a full build-out under the 2040 Plan.
Using that approach, the district court correctly determined that respondents established a
prima facie case for relief under MERA and that the city failed to raise a genuine issue of
material fact sufficient to preclude summary judgment. We therefore affirm the district
court’s grant of summary judgment to respondents.
II.
Upon determining a violation of MERA, “The court may grant declaratory relief,
temporary and permanent equitable relief, or may impose such conditions upon a party as
are necessary or appropriate to protect the air, water, land or other natural resources located
within the state from pollution, impairment, or destruction.” Minn. Stat. § 116B.07; see
also State ex rel. Swan Lake Area Wildlife Ass’n v. Nicollet Cnty. Bd. of Cnty. Comm’rs,
799 N.W.2d 619, 625 (Minn. App. 2011) (Swan Lake III). A district court “may issue an
injunction that ‘provides an adequate remedy without imposing unnecessary hardship on
the enjoined party.’” State ex rel. Wacouta Twp. v. Brunkow Hardwood Corp., 510 N.W.2d
27, 31 (Minn. App. 1993) (quoting Cherne Indus., Inc. v. Grounds & Assocs., Inc., 278
N.W.2d 81, 93 n.6 (Minn.1979)). This court reviews the district court’s equitable decision
to award relief under MERA for an abuse of discretion. Swan Lake III, 799 N.W.2d at 625.
An abuse of discretion occurs when the district court’s decision is against the facts in the
record or based on legal error. Id.
The city argues that the injunctive relief ordered by the district court (1) is based on
inadequate notice that injunctive relief would be ordered without further proceedings and
14
(2) lacks findings and record support for the relief ordered. The first argument does not
persuade us. The city had notice that respondents were seeking injunctive relief and that
the district court was considering injunctive relief in conjunction with the summary-
judgment proceedings. Indeed, the city filed a response to respondents’ proposed order
granting injunctive relief, raising many of the same arguments it does on appeal. Although
the better practice might be to hold a separate hearing on injunctive relief, the city does not
cite, and we are not aware of, authority requiring such procedure. We therefore conclude
that the district court did not abuse its discretion in this regard.
But the city’s second argument is persuasive. In opposing respondents’ proposed
injunctive relief, the city argued that “injunctive relief would not remedy issues arising
from full build -out [of the 2040 Plan] unless a full build-out under the new order’s
conditions [reversion to the 2030 Plan] would cause fewer environmental effects.”
Respondents, the city asserted, had “provide[d] the Court no basis to infer that a full build-
out under [the 2030 Plan] would be less harmful to the environment than a full build-out
of Minneapolis 2040.” The district court ordered the city to revert to the 2030 Plan without
findings on the necessity and scope of injunctive relief, and the analysis of this issue in its
accompanying memorandum is brief:
The relief requested by Plaintiff is that the City be
enjoined from any ongoing implementation of the 2040 Plan,
and that the City be required to revert back to the 2030 Plan for
its prospective enforcement of both residential development
and land use ordinances. While this may no doubt create no
small amount of short- term chaos— which the court does not
take lightly—this court is inclined to agree that, under MERA,
no other action by the court would properly address or remedy
the likely adverse environmental impacts of the 2040 Plan.
15
“Where the trial court has broad discretion, the Minnesota Supreme Court has
demonstrated persistence in demanding findings to explain the trial court’s exercise of
discretion.” In re Amitad, Inc., 397 N.W.2d 594, 596 (Minn. App. 1986); see Stich v. Stich,
435 N.W.2d 52, 53 (Minn. 1989) (remanding for additional findings where district court’s
findings were insufficient to enable an appellate court to determine whether district court
properly considered statutory requirements). Given the lack of findings supporting the
district court’s grant of injunctive relief, as well as the district court’s limited analysis of
this issue, the record is insufficient for this court to determine whether the district court
properly exercised its discretion in granting injunctive relief. Accordingly, we reverse the
injunctive relief and remand for additional proceedings on respondents’ request for
injunctive relief.
Affirmed in part, reversed in part, and remanded.