A18-1312 Precedential Affirmed Processed

, A18-1524, A18-1608

Minnesota Court of Appeals · Filed May 28, 2019

The holding in the court’s own words

But we conclude that this was not error. According appropriate deference to that expertise, we conclude that the DNR’s determination in this regard is based on a proper application of the law, supported by substantial evidence, and is not arbitrary and capricious.

Quoted verbatim from the opinion — no paraphrase, nothing generated. Not yet human-reviewed. How we find the holding.

Opinion text

This opinion will be unpublished and
may not be cited except as provided by
Minn. Stat. § 480A.08, subd. 3 (2018).

STATE OF MINNESOTA
IN COURT OF APPEALS
A18-1312, A18-1524, A18-1608

In re Applications for a Supplemental
Environmental Impact Statement
for the Proposed NorthMet Project.

Filed May 28, 2019
Affirmed
Worke, Judge

Minnesota Department of Natural Resources

Paula G. Maccabee, Just Change Law Offices, St. Paul, Minnesota (for relator
WaterLegacy)

Margo S. Brownell, Evan A. Nelson, Maslon LLP, Minneapolis, Minnesota (for relator
Friends of the Boundary Waters Wilderness)

Elise L. Larson, Ann E. Cohen, Minnesota Center for Environmental Advocacy, St. Paul,
Minnesota (for relator Minnesota Center for Environmental Advocacy)

Monte A. Mills, Caitlinrose H. Fisher, Greene Espel PLLP, Minneapolis, Minnesota; and

Jay C. Johnson, Venable LLP, Washington, D.C. (for respondent Poly Met Mining, Inc.)

Sherry A. Enzler, Minnesota Department of Natural Resources, St. Paul, Minnesota; and

John C. Martin, Sarah Koniewicz, Holland & Hart LLP, Jackson, Wyoming (for respondent
Minnesota Department of Natural Resources)

Considered and decided by Slieter, Presiding Judge; Worke, Judge; and Schellhas,
Judge.
2
U N P U B L I S H E D O P I N I O N
WORKE, Judge
In these consolidated certiorari appeals, relators Minnesota Center for
Environmental Advocacy (MCEA), Friends of the Boundary Waters Wilderness (Friends),
and WaterLegacy (WL) challenge decision s by respondent Minnesota Department of
Natural Resources (DNR) denying requests for preparation of a supplemental
environmental-impact statement (SEIS) in relation to the NorthMet project, a copper-
nickel-platinum group elements (PGE) mine proposed by respondent Poly Met Mining Inc.
(PolyMet). We affirm.
FACTS
If built, the NorthMet project will be the first copper-nickel- PGE mine in
Minnesota. As proposed, the project consists of a mine site six miles south of Babbitt; a
plant site six miles north of Hoyt Lakes; and a transportation and utility corridor connecting
the mine and plant sites. Surface mining and processing of copper-nickel-PGE ore would
take place over an approximately 20-year timeframe (mine life) at a rate of 32,000 tons per
day (tpd) of ore processed. Mining would be conducted in three open pits, and ore would
be transported to the plant site by rail for processing. Tailings resulting from processing
would be stored in an existing but upgraded tailings basin at the plant site. 1 Reclamation

1 As defined in the final environmental-impact statement (FEIS ), t ailings are “[w]aste
byproducts of mineral beneficiating processes . . . consisting of rock particles, which have
usually undergone crushing and grinding, from which the profitable mineralization has
been separated.” A tailings basin is “[l]and on which is deposited, by hydraulic or other
means, the material that is separated from the mineral product in the beneficiation or
3
following the 20-year mine life would include monitoring and maintenance of water quality
until conditions were deemed environmentally acceptable and in a self -sustaining and
stable condition.
Because the project requires federal and state approvals, environmental review was
required under both the National Environmental Policy Act (NEPA) and the Minnesota
Environmental Policy Act (MEPA). After issuing a draft environmental-impact statement
(DEIS) in 2009 and a supplemental draft environmental-impact statement (SDEIS) in 2013,
and receiving public comments on both, the DNR, the United States Army Corps of
Engineers, and the United States Forest Service released an FEIS on November 6, 2015.
The DNR issued a decision determining the FEIS adequate on March 3, 2016; that decision
was not appealed.
On June 8, 2018, MCEA and Friends submitted to the DNR a petition for the
preparation of an SEIS under Minn. R. 4410.3000 (2017). On July 11, 2018, the DNR
issued a decision denying that request. On July 18, 2018, WL submitted an SEIS petition,
which the DNR denied on August 20, 2018. The DNR published notice of these denials in
the EQB Monitor on September 10, 2018, triggering the period to appeal those decisions.
See Minn. Stat. § 116D.04, subd. 10 (2018) (providing 30-day period to appeal final
decision on need for environmental-impact statement ( EIS), period runs from publication

treatment of ferrous minerals including any surrounding dikes constructed to contain the
material.”
4
in the EQB Monitor). MCEA (A18-1312), Friends (A18-1608), and WL (A18-1524) filed
separate certiorari appeals, which this court consolidated.2
D E C I S I O N
Under Minnesota law, a permit is required to mine, and no permit may be issued
until an EIS has been completed and determined to be adequate. See Minn. Stat. §§ 93.481
(2018) (prohibiting mining without permit); 116D.04, subds. 2a-2b (2018) (requiring
adoption of rules governing categories of projects for which EIS is required and providing
that, when required, EIS must be prepared and determined adequate before permit may be
granted); Minn. R. 4410.4400, subps. 1, 8 (2017) (requiring EIS for new mining facility).
Under certain circumstances, preparation of an SEIS is required after an EIS has
been prepared and determined adequate. See Minn. R. 4410.3000, subp. 3. A project is
considered exempt from supplemental EIS requirements after all government decisions
have been made, or after a “substantial portion of the project has been completed and an
EIS would not influence remaining construction.” Minn. R. 4410.4600, subp. 2( B), (D)
(2017). An SEIS is required if, before a project becomes exempt, either
(1) substantial changes have been made in the proposed project
that affect the potential significant adverse environmental
effects of the project; or
(2) there is substantial new information or new circumstances
that significantly affect the potential environmental effects
from the proposed project that have not been considered in the

2 After these appeals were filed, the DNR issued a permit to mine and dam-safety permits
and the Minnesota Pollution Control Agency issued National Pollutant Discharge
Elimination System/State Disposal System and air-emissions permits for the NorthMet
project. Multiple certiorari appeals from these permitting decisions are pending before this
court.
5
[F]EIS or that significantly affect the availability of prudent or
feasible alternatives with lesser environmental effects[.]

Minn. R. 4410.3000, subp. 3(A).
The DNR’s decision not to require an SEIS is subject to this court’s review under
the Minnesota Administrative Procedure Act (MAPA) to determine whether the
the substantial rights of the [relators] may have been prejudiced
because the administrative finding, inferences, conclusion, or
decisions are:
(a) in violation of constitutional provisions; or
(b) in excess of the statutory authority or jurisdiction of
the agency; or
(c) made upon unlawful procedure; or
(d) affected by other error of law; or
(e) unsupported by substantial evidence in view of the
entire record as submitted; or
(f) arbitrary or capricious.

Minn. Stat. § 14.69 (2018); see Minn. Stat. § 116D.04, subd. 10 (2018) (providing for
judicial review under MAPA). Appellate courts “accord substantial deference to the
agency’s decision.” Citizens Advocating Responsible Dev. v. Kandiyohi Cty. Bd. of
Comm’rs, 713 N.W.2d 817, 832 (Minn. 2006) (CARD). “[This court’s] role when
reviewing agency action is to determine whether the agency has taken a ‘hard look’ at the
problems involved, and whether it has ‘genuinely engaged in reasoned decision-making.’”
Id. (quoting Reserve Mining Co. v. Herbst, 256 N.W.2d 808, 825 (Minn. 1977)). The
burden is on relators to show agency error. See id. at 832-33.
The DNR’s decision is not based on an error of law
As a threshold matter, relators argue that the DNR erred by interpreting Minn. R.
4410.3000 to provide that an SEIS may be required only based on information provided by
6
PolyMet. This argument mischaracterizes the DNR’s decisions and misstates the relevant
law. The DNR considered and issued substantive decisions on relators’ petitions for an
SEIS. It did not deny those petitions on the basis that the information submitted was not
from PolyMet. The DNR did reject arguments for an SEIS based on assertions of changes
to the project that had not been proposed by PolyMet. But we conclude that this was not
error.
“The purpose of an EIS is to provide information for governmental units, the
proposer of the project, and other persons to evaluate proposed projects which have the
potential for significant environmental effects, to consider alternati ves to the proposed
projects, and to explore methods for reducing adverse environmental effects.” Minn. R.
4410.2000, subp. 1 (2017). The project “proposer” is “the person or governmental unit
that proposes to . . . undertake a project,” here PolyMet. Minn. R. 4410.0200, subp. 68
(2017). As the proposer, PolyMet sets the parameters of the proposed project. See CARD,
713 N.W.2d at 835 (summarizing inquiry for determining whether EIS required as
“whether the project, as proposed, ha[s] the potential for causing significant environmental
effects” (emphasis added)); Iron Rangers for Responsible Ridge Action v. Iron Range Res.,
531 N.W.2d 874, 881 (Minn. App. 1995) (holding that responsible governmental unit
“cannot be compelled to prepare an EIS on the basis of speculative factors”), review denied
(Minn. July 28, 1995).
As the DNR explains, there are two distinct bases for requiring an SEIS. The first
basis, under subpart 3(A)(1), depends on changes to the proposed project significantly
affecting environmental effects . Minn. R. 4410.3000, subp. 3(A)(1). This first basis
7
necessarily depends on the project proposer making changes to the proposed project.
Accordingly, this provision cannot be triggered by third-party assertions that the project
has changed, or is expected to change.
MCEA and Friends assert that a change to the project may come about through
circumstances other than the project proposer making a change. For instance, they posit
that a change in availability of a water source for a project would constitute a change in the
project. We disagree. The change in water availability for a project might constitute a new
circumstance requiring an SEIS on the second basis, under subpart 3(A)(2). But it would
not be a project change. However, if the project proposer later proposed using a different
water source as a result of the availability issue, that would constitute a project change that
might require an SEIS under subpart 3(A)(1).
MCEA and Friends also assert that the DNR’s response to their petitions for an SEIS
did not distinguish between the first and second bases for requiring an SEIS in the manner
that the DNR has done in its brief to this court. Again here, we disagree. In responding to
the petitions, the DNR explained that, with respect to the first basis, the DNR had received
no formal notification of a project change, and, with respect to the second basis, the new
information submitted by MCEA and Friends did not significantly af fect the potential for
environmental effects because it was too speculative. Thus, the DNR rejected MCEA’s
and Friends’ petitions for two distinct, albeit related, reasons consistent with the distinct
purposes of the first and second bases for requiring an SEIS.
8
The DNR reasonably determined that there is no change to the project requiring an SEIS

The parties agree that PolyMet made a change to the proposed project when it
eliminated a wastewater treatment facility (WWTF) that was originally proposed for the
mine site and added a mine-to-plant pipeline to transport wastewater to the plant site for
treatment (the wastewater treatment system (WWTS)). WL asserts that this change
requires preparation of an SEIS. The DNR considered whether th e change required an
SEIS when PolyMet proposed the change and again in response to WL’s petition for an
SEIS, concluding both times that it did not.
In initially determining that an SEIS was not required, the DNR identified the
minimal nature of the proposed change, noting that “[m]ine water transfers between the
Mine and Plant Sites would be accomplished using a three pipeline system instead of one
pipe as originally proposed.” The DNR also catalogued the conditions that would not be
altered by the proposed change:
No changes are proposed for the actual Mine Site and
Plant Site wastewater treatment processes from those evaluated
in the [ F]EIS. . . . No change is projected in the volume of
wastewater that would be treated through the WWTS from the
original configuration. No changes in the WWTS discharge
quantity and quality are anticipated during operations,
reclamation, and closure from that projected under the original
two-facility design. . . . Implementing the single facility
WWTS will not result in additional m ining roads, production
rates, plant emission rates, or dewatering rates from those
currently proposed and evaluated in the [F]EIS.

In later rejecting WL’s petition, the DNR explained:
The elimination of the Mine Site WWTF constitutes a
consolidation of two originally separate treatment facilities,
one at the Mine Site and one at the Plant Site, into one facility
9
located at the Plant Site and designated as the [WWTS]. While
this is a structural change in project infrastructure, there is no
functional dif ference in the capacity of the WWTS to treat
contaminated water from the Mine Site, regardless of source,
relative to what was assessed in the [F] EIS for the Mine Site
WWTF. Combining the two treatment facilities into a single
facility does not change, in any material way, the potential
significant adverse environmental effects of the project. . . .
DNR acknowledges the conveyance of untreated water
in a new Mine to Plant Pipeline (MPP) along the
Transportation Corridor is a new project feature. However, the
[F]EIS’ overall consideration of pipeline integrity and the
potential for spills is still valid for the project and is applicable
to understanding the potential for environmental effects
associated with the MPP. . . .
Regarding potentially accelerated transition to non-
mechanical water treatment methods at the Mine Site due to
elimination of the Mine Site WWTF, DNR rejects this
suggestion and finds there is no basis for this unfounded
conclusion.

On appeal, WL argues that an SEIS is required because of the potential
environmental effects of the mine-to -plant untreated water pipeline and the long-term
effects of not having mind-site wastewater treatment. 3 In deciding whether a project has
the potential for significant environmental effects, an agency considers the “type, extent,
and reversibility of environmental effects[,]” available mitigation, and “the extent to which
environmental effects can be anticipated and controlled as a result of other available

3 WL also asserts on appeal that an SEIS was required because the project change will
affect potential effects to air and water quality. But WL forfeited any air-quality arguments
by failing to raise them in its petition for an SEIS. See Dep’t of Transp. v. Pub. Citizen, 541 U.S. 7 52, 764-65, 124 S. Ct. 2204, 2214 (2004) (holding that issues not raised to
agency in environmental-review proceedings are forfeited); see also Thiele v. Stich, 425
N.W.2d 580
, 582 (Minn. 1988) (stating that generally an appellate court will not consider
matters not argued to or considered by the district court); Hentges v. Minn. Bd. of Water &
Soil Res., 638 N.W.2d 441, 448 (Minn. App. 2002) (applying Thiele principles to an
administrative appeal), review denied (Minn. Mar. 27, 2002).
10
environmental studies undertaken b y public agencies or the project proposer, including
other EISs.” See Minn. R. 4410.1700, subp. 7 (2017) (governing decision on need for EIS);
see also Sierra Club v. U.S. Army Corps of Eng’rs, 295 F.3d 1209, 1215-16 (11th Cir.
2002) (explaining that “[t]he standard for determining when an SEIS is required is
essentially the same as the standard for determining when an EIS is required” (quotation
omitted)). In this case, the DNR applied its expertise to determine that the wastewater-
treatment change “does not change, in any material way, the potential significant adverse
environmental effects of the project” and that the FEIS’ “overall consideration of pipeline
integrity and the potential for spills is still valid for the project and is applicable to
understanding the potential for environmental effects associated with the MPP.”
WL argues that the DNR’s reasoning is not supported by the record because the
FEIS does not analyze pipeline integrity or spills. Logically, the DNR did not analyze
potential effects of a wastewater-pipe spill in the FEIS because such a pipe was not part of
the project as originally proposed. But the lack of such analysis alone cannot compel
completion of an SEIS, or an SEIS would be required for every change to a project. Most,
if not all, project changes will not be discussed in an EIS —precisely because they are
changes. If the rule intended for any change to a project to require an SEIS, it could have
so stated. Instead, the rule requires an SEIS only when a change is “substantial” and
“affect[s] the potential significant adverse environmental effects of the project.” Minn. R.
4410.3000, subp. 3(A)(1). In this case, the DNR applied its technical expertise to
determine that these requisites were not met . According appropriate deference to that
expertise, we conclude that the DNR’s determination in this regard is based on a proper
11
application of the law, supported by substantial evidence, and is not arbitrary and
capricious.
The DNR reasonably determined that there is not substantial new information requiring
preparation of an SEIS

Relators assert that a technical report filed by PolyMet under Canadian securities
laws includes new information that significantly affects potential environmental effects
from the proposed project and was not considered by the DNR in the FEIS. More
specifically, relators assert that disclosures about the financial viability of the NorthMet
project as proposed, and discussion about potential expansions to the project require an
SEIS. WL additionally asserts that the technical report includes new information on an
alternative for tailings disposal that requires an SEIS.
Financial information
Relators point out that the technical report forecasts a projected internal rate of
return (IRR)4 for the project that is lower than the IRR stated in the FEIS. But relators do
not explain how the revised IRR significantly affects environmental effects or alternatives.
MCEA and Friends suggest that the revised IRR “constitute[s] a significant change
in the ‘purpose and need’ for the Project,” and “significantly affect[s] the availability of
prudent and feasible alternatives.” Relators note that a responsible governmental unit
(RGU) preparing an EIS must consider alternatives to a project and can reject any
alternative that does not meet the underlying need for or purpose of the project. While

4 An IRR is “a discounted-cashflow method of evaluating a long-term project, used to
determine the actual return on an investment.” Bryan A. Garner, ed., A Handbook of
Business Law Terms 491 (1999).
12
relators accurately cite the language in Minn. R. 4410.2300(G) (2017) regarding
alternatives, none explain how a rule allowing rejection of alternatives applies to require
additional analysis of the project itself.
MCEA and Friends also cite a recent federal district court decision that they describe
as “ordering the preparation of a[n S]EIS based on the impact of low oil prices on the
profitability of a pipeline.” See Indigenous Envtl. Network v. United States Dep’t of State,
347 F. Supp. 3d 561 (D. Mont. 2018). In Indigenous Envtl. Network, the court did require
an SEIS based in part on changes in the market for oil, but not because of the impact on
profitability of the pipeline. Id. at 576-77. Rather, the court analyzed oil prices in
connection with rejecting the federal government’s argument that upstream effects on
greenhouse gases need not be analyzed as indirect environmental effects because oil
production was expected to remain flat. Id. The Indigenous Envtl. Network decision is not
helpful here.
WL argues that the revised IRR requires an SEIS because “the Project lacks
sufficient income to cover reclamation costs projected by the DNR to prevent and mitigate
environmental harm as well as investor returns.” But WL cites no authority requiring the
DNR to analyze the financial viability of a project in connection with conducting
environmental review.
In rejecting the petitions for an SEIS, the DNR reasoned that (1) the FEIS meets all
requirements for stating the project’s purpose and no statute or rule required the FEIS to
analyze the purposes of the project; and (2) the lower IRR in the technical report still
supported the existence of a profitable project, and thus there was “ no basis to conclude
13
that the Project will be financially unable to cover the costs of reclamation and closure.”
On appeal, the DNR emphasizes that new information requires an SEIS only when it
significantly affects the environmental effects of a proposed project and that even the lower
IRR in the technical report was calculated after taking into account reclamation and closure
costs. The DNR also points out that it is up to the project proposer to determine what
financial rate of return it will require in order to pursue a project, and that the DNR’s only
responsibility in this regard is to ensure that the financial-assurances requirements of the
mining statutes and regulations are met. See Minn. Stat. § 93.49 (2018) (requiring operator
of mine to provide bond, other security, or financial assurance satisfactory to
commissioner); Minn. R. 6132.1200 (2017) (providing that purpose of financial assurance
is to ensure source of funds for reclamation and closure, and setting forth financial-
assurance requirements).
We conclude that the DNR’s analysis in this regard is based on a proper application
of the law, supported by substantial evidence, and is not arbitrary and capricious.
Project expansion
With respect to project expansion, relators point to discussion and financial
projections in the technical report regarding two potential mine expansions, one that would
process 59,000 tpd over a 14-year mine life, and one that would mine 118,000 tpd over an
18-year mine life (as opposed to the 32,000 tpd and 20- year mine life of the proposed
project). The report cautions that “further engineering, environmental studies and
permitting would be required to prove the economic viability of these potential scenarios
14
and to i mprove the economic uncertainties associated with these estimates” and that the
“expansion scenarios would require significant capital investment.” 5
Because the expansions are not part of the project as currently proposed, they would
be analyzed , if at all, as potential cumulative effects of the project. See Minn. R.
4410.2300(H) (2017) (requiring analysis of direct, indirect, and cumulative potential
environmental effects of a project).
“Cumulative potential effects” means the effect on the
environment that results from the incremental effects of a
project in addition to other projects in the environmentally
relevant area that might reasonably be expected to affect the
same environmental resources, including future projects
actually planned or for which a basis of expectation has been
laid, regardless of what person undertakes the other projects or
what jurisdictions have authority over the projects. . . . In
determining if a basis of expectation has been laid for a project,
an RGU must determine whether a project is reasonably likely
to occur and, if so, whether sufficiently detailed information is
available about the project to contribute to the understanding
of cumulative potential effects. In making these
determinations, the RGU must consider: whether any
applications for permits have been filed with any units of
government; whether detailed plans and specifications have
been prepared for the project; whether future development is
indicated by adopted comprehensive plans or zoning or other
ordinances; whether future development is indicated by

5 MCEA and Friends cite a Canadian Securities Administrators Staff Notice providing that
a preliminary economic assessment (PEA) is “the first signal to the public that a mineral
project has potential viability” and that the “market views PEA results as important
information.” That same document emphasizes that the PEA is “a conceptual study of the
potential viability of mineral resources” that “requires specific cautionary language” and
that pre-feasibility and feasibility studies are more comprehensive studies that actually
demonstrate economic viability.
15
historic or forecasted trends; and any other factors determined
to be relevant by the RGU.

Minn. R. 4410.0200, subp. 11a (2017).
The DNR determined that the discussion of mine expansions in the technical report
did not require an SEIS, reasoning that “specific information on potential mining scenarios
and mineable resources that would be needed for meaningful environmental review is
lacking, and an expansion remains speculative.” The DNR properly considered the facts
that (1) the technical report itself characterizes the discussion as preliminary; and (2) no
permits have been sought for expansion to the project. See id.; White v. Minn. Dep’t of
Nat. Res., 567 N.W.2d 724, 731-32 (Minn. App. 1997) (holding that DNR did not err by
excluding from cumulative-effects analysis future trails when no future projects were
anticipated: “Because there were no specific plans . . . any effects they may have . . . are
speculative, and any consideration of these effects is equally speculative.”), review denied
(Minn. Oct. 31, 1997). 6 Relators challenge the DNR’s judgment that expansions to the
NorthMet mine are not sufficiently foreseeable to require an SEIS. But we defer to the
DNR’s judgment and conclude that the DNR’s analysis is based on a proper application of
the law, supported by substantial evidence, and is not arbitrary and capricious.

6 The White appeal arose out of a negative declaration on the need for an EIS, which also
requires the decision- maker to determine whether there will be cumulative potential
effects. See Minn. R. 4410.1700, subp. 7 (B).
16
Tailings-disposal alternative
WL asserts that the technical report includes new information about a tailings-
disposal alternative that requires preparation of an SEIS. In support of this argument, WL
relies on two sentences in the technical report:
PolyMet has evaluated placing tailings from the 118,000
[standard tons per day] STPD flotation circuit by gravity to two
existing taconite mine pits near the Erie plant. This is a less
costly alternative than building out the existing [flotation
tailings basin] large enough to contain the additional volume
anticipated under this scenario.

Based on the two sentences, WL asserts that “PolyMet determined in-pit disposal of
NorthMet mine tailings would be feasible, since tailings could be placed ‘by gravity to two
existing taconite mine pits’ near the processing circuit.” This vastly overstates the two
sentences in the technical report, which state merely that PolyMet has “evaluated” placing
tailings in mine pits and do not disclose the results of that evaluation.
In determining the FEIS adequate, the DNR stated:
In-Pit Tailings Disposal. This alternative disposal measure
was considered [in the final scoping document]. The only
available location for this approach to be pursued was the
LTVSMC Area 5 pits. Even if this alternative was used, a
tailings basin would still be required because the Area 5 pit
would not have enough capacity for all of the tailings
produced. Therefore, the action did not provide significant
environmental benefit over the proposed action.

Thus, the DNR determined in scoping that the only available location for in-pit disposal
could not accommodate the tailings that would be produced by the proposed project. WL
did not challenge the DNR’s decision determining the FEIS adequate, and cannot do so
now. See Minn. Stat. § 116D.04, subd. 10 (providing 30-day appeal period for such
17
decisions). And we reject WL’s argument that the technical report’s two-sentence
reference to ev aluation of in-pit disposal is substantial new information that requires the
DNR to re-evaluate the alternative of in-pit tailings disposal in an SEIS. Again here, the
DNR’s analysis is based on a proper application of the law, supported by substantial
evidence, and is not arbitrary and capricious.
Affirmed.